Finished walnut beam wraps lined up on a table in our shop, ends open
  • ★ 5.0 on Google · 23 reviews
  • Our own shop in Converse
  • 1-yr cosmetic / 2-yr mechanical warranty

How We Work in San Antonio First Visit to Final Walkthrough

Each step of a job with us, from the free visit and the design to the build in our Converse shop, the install and the warranty.

One Job, Start to Finish

A Built-In Wall in Alamo Heights

The wall before we started, the cabinets and bookcases in place before paint, and the finished wall. See the whole job.

Before: The living room wall before the built-ins, with a mounted TV and in-wall speakersBefore
The wall before we started, with the TV and the speakers in their original spots.
In progress: The lower cabinets and arched bookcases built in along the wall, before paintIn progress
The cabinets and bookcases in place along the wall, before paint.
Finished: Full Wall Built-In Entertainment Center in Alamo Heights, TXFinished
Full-wall built-in entertainment center, Alamo Heights (2025)
Before: The electric fireplace in a white box on a plain living room wall, before the shiplapBefore
The electric fireplace in its white box on the wall, before we started.
Before: The old dark box bar under the pergola, before the rebuildBefore
The old box bar under the pergola, before the rebuild.
Before: The old bar area under the pergola, seen from behind the barBefore
The old bar area from behind, before the rebuild.

Step 1 · The Visit

A Free Visit to See the Space

Pick a time online or give us a call. Most jobs start with one of us walking the space with you, talking through what you have in mind, your budget and your timeline. The visit is free.

We take measurements and ask what you need the space to do. On a built-in, we find out what the wall is actually doing before anything gets designed. Depending on the job, we measure at the first visit or at a follow-up visit once you decide to move forward.

If you have a designer, we work alongside them. If the job needs a permit, we handle the application and the inspections.

Step 2 · Design

See It Drawn Before We Build It

For cabinetry, built-ins and custom pieces, we draw it up and show you a 3D rendering before anything is built, so you can check shelf spacing, proportions and finish, with material samples in hand. The first design is free and includes one revision; more revisions are available at additional cost.

Two real jobs below: each design rendering beside a photo of what we built. The builds moved on from the first drawing in places.

Rendering - not a photo: Mozaik design rendering of the final layoutRendering - not a photo
Mozaik design rendering of the final layout
Finished: Built-In Library Wall With Arched Window in Boerne, TXFinished
Library wall around an arched window, Boerne (2026)
Rendering - not a photo: Design rendering, before the buildRendering - not a photo
Design rendering, before the build
Finished: Floating Walnut Media Wall, Front View in Alamo Ranch, San Antonio, TXFinished
Floating walnut media wall from the front, Alamo Ranch (2025)

Step 3 · The Estimate

An Itemized Price in Writing

You get a line-by-line estimate in writing, so you can see where every dollar goes and adjust the scope if you need to.

Apart from allowance items, the price only changes if the scope does. When it does, we write a change order, and you approve it before it is billed. An allowance covers something you choose later, like tile or fixtures, and settles when you make your final pick.

Payment is usually a deposit to hold your date (typically 50%), progress payments at milestones, and the final payment when the job is done. The exact schedule is in your contract. We prefer check; credit cards carry a 3% processing fee.

Want a ballpark first? Our services page lists what each kind of job usually costs.

In progress: Milled walnut boards laid out on a shop bench with clampsIn progress
Milled boards laid out on the bench.
In progress: A decorative cut-out panel in progress on the CNC router in our shopIn progress
A decorative cut-out panel in progress on our CNC.
In progress: A long glued-up walnut beam on the shop floorIn progress
A wrap glued up in the shop.

Step 4 · The Build

Built in Our Shop in Converse

Cabinetry and millwork are built in our own shop in Converse. Our standard cabinet is a plywood box with a face frame, and we build frameless too. Parts are cut on our own CNC for a precise fit, then assembled in the shop. Most of our doors are built there as well.

Finishing depends on the job: some pieces are finished in the shop, some go to a finisher we trust, and some are painted on site after install.

Come by the shop and see your cabinets being built.

Most custom cabinet projects, kitchens included, take 4-8 weeks from design approval to installation, depending on our current schedule. A single bathroom vanity can be quicker. More on our custom cabinets.

In progress: Close-up of a mitered corner on a walnut beam wrap, with the grain running around the edgeIn progress
A mitered corner: the grain runs around the edge instead of stopping at a seam.
In progress: End view of a plain walnut beam wrap showing three sides and an open bottom, in front of a distressed walnut beamIn progress
The end of a wrap: three sides of walnut, open on the bottom where it fits over the drywall beam. The piece in front is plain walnut; the beam behind it shows the distressed texture this job got.
In progress: Walnut beams going up on the vaulted ceiling, with a scaffold in the roomIn progress
The beams going up, with blue tape still on the edges where each one was marked and scribed to the ceiling.
In progress: Setting a walnut beam against the vaulted ceiling from a scaffoldIn progress
A preliminary fit from the scaffold. The blue tape along the edge is where we mark the beam against the ceiling before trimming it.
In progress: A view down the unpainted built-in wall, with a glass-door cabinet at the endIn progress
Looking down the wall before paint, with the glass-door cabinet at the end.

Step 5 · The Install

Installed by Our Crew

We set the cabinets, scribe them to the walls, fasten and trim them out, adjust the doors and drawers, and clean up behind ourselves.

We run the rest of the job too: tile, lighting, plumbing and paint, with trade partners we have worked with for years.

An owner leads every job, with routine walkthroughs for quality. We answer our phone, we text when we are on the way, and you always know what is next.

Finished: Custom Kitchen Vent Hood in Terrell Hills, TXFinished
Custom kitchen vent hood, Terrell Hills (2021)
Finished: Floor To Ceiling Built-In Library Shelving in Boerne, TXFinished
Floor-to-ceiling library shelving, Boerne (2026)
Finished: Built-In Library, Brass Gallery Rails in Boerne, TXFinished
Library shelves with brass gallery rails, Boerne (2026)

Step 6 · Walkthrough

A Final Walkthrough and Our Warranty

We walk the finished job with you and stand behind it: 1 year on cosmetic items, 2 years on mechanical. Manufacturer warranties on the products we install pass through as the manufacturer's own.

See how these steps played out on real jobs:

Ready when you are

Book a visit and we'll walk the space with you, or call (210) 636-8408.

Book a Visit

Serving San Antonio & Surrounding Areas

Business Hours:

Monday - Friday: 8:00 AM - 5:00 PM

Saturday: 9:00 AM - 3:00 PM | Sunday: Closed

Call NowBook a Visit