
Our First Job: A Castle Hills Remodel
Castle Hills, TX - 2020
We took out a section of wall and put in a new LVL beam, redid the master bath and reworked the kitchen island. Opie built the bar afterward.
Scope: LVL beam where a wall section came out; beam wraps in the great room; master bath redone with a walk-in shower, freestanding tub, heated floors and a premade floating vanity; a zebrawood half-bath vanity we built; level 5 drywall on half the house; kitchen island and pass-through reworked; masonry at two fireplaces; the bar; paint throughout
Timeline: About 4 to 6 months
Investment: $100,000+ (includes the bar and the materials the homeowner bought directly)





















